Buildings: 9 Geschosse Wohngebaeude UeberwachungCase study: SystemReal-time monitoring during construction
Project DescriptionSummary: Real time monitoring of the behaviour of an external wall of a building during pouring of reinforcement wall Clients: gb&t Geb?debestand & Technik GmbH Place: Sisseln (Switzerland) Period: 2009 - 2009 Installation: Smartec Structure's short description: 9 levels apartments building Aim of monitoring: The building war renewed and consolidated Number of sensor: 1 Main Results: The real-time measurement were taken continousely every 5 seconds during pouring of concrete (~45 min) and during the following 90 minutes. The measuring system was supposed to trigger a pre-warning in case of a wall deformation of 2mm and a warning in case of a 2.5mm deformations.
Monitored wall with sensor installation set-up
Sensor detail Bibliography: N/A
|
|
|||||||||||||||||||
|
|
||||||||||||||||||||
|
© SMARTEC SA 2009 - CREDITS |
||||||||||||||||||||