Bridges: Arsta Bridge

Case study: SOFO, ADAM System

Long-term monitoring
Concrete bridge
Design verification

Project Description

Summary: Complete monitoring of new Arsta Railway Bridge

Clients: Bemek Geomekaniska Instrument AB

Place: Stockholm (Sweden)

Period: 2002  - 2003

Installation: Bemek AB / Smartec SA

Structure's short description: The Arsta railway Bridge is the new double-track Arsta railway bridge. The new bridge, will span Stockholm's Arstaviken bay, with a length of 833 meters / 2732 feet. The bridge will include service roads on each side of the tracks with pedestrian and bicycle paths.

Aim of monitoring: The aims are: The comparison of the monitoring results whis theoretical hypotheses Controll of the bridge behaviour during construction, testing period and life span Verify the uncertainties of bridge design, increase know-how for future projects integrating monitoring in bridge design

Number of sensor: 46

Main Results: The sensors installation will start next January 2003

New bridge next to old bridge. (it is possible to see concrete pillars and construction works at each river side)

Bibliography:

 

Monitoring fo the new Arsta railway bridge using fiber optic and traditional sensor technology , M. Enckell-El Jemli, R. Karoumi, F. Lanaro, SPIE Symposium on Smart Strucutres and Materials, 2-6 March 2003, San Diego, USA, Vol. 5057, 2003

Monitoraggio Strutturale Combinato, Statico e Dinamico, con Sensori a Fibra Ottica a Base di Misura Estesa, Daniele Inaudi, Branko Glisic, Angelo Figini, Andrea Del Grosso, giornate aicap 2004, 23? Convegno Nazionale, 26-29 maggio, Verona, pagine 561-567, 2004

Structural Health Monitoring of Bridges in Sweden , M. Enckell, The 3rd International Conference on Structural Health Monitoring of Intelligent Infrastructure - SHMII-3, November 13-16, On Proceedings CD, 2007

 

 

 

 

 

©  SMARTEC SA 2009 - CREDITS