Bridges: Geotechnisches Inst. CH - Guemmenen Viadukt - MuST

Case study: SOFO System

Dynamic monitoring

Project Description

Summary: The structure is a stone masonery railway viaduct located in canton Bern

Clients: SBB

Place: Guemmenen - BE (Switzerland)

Period: 2009  - 2009

Installation: Geotechnisches Institute

Structure's short description: The viaduct consists of more than 20 short span arches

Aim of monitoring: Monitoring of the main frequency during the dynamic loading tests

Number of sensor: 0

Main Results: N/A

Overview

Bibliography:

 N/A

 

 

 

 

 

©  SMARTEC SA 2009 - CREDITS