Buildings: Hyundai Building Seul

Case study: SOFO System

Vertical displacement monitoring
Metal truss beam strain monitoring

Project Description

Summary: Vertical desplacement monitoring of a pedestrain bridge linking 2 twin towers

Clients: Hyundai Corporation

Place: Seul (Korea)

Period: 2006  - 2006

Installation: Golden Weel

Structure's short description: Metal truss beam construction covered by glasses

Aim of monitoring: Monitor of abnormal strain deformations and vertical displacement of the truss beam center part during lift up operation. Long term monitoring during service

Number of sensor: 12

Main Results: N/A

Truss

Hyundai twin towers

Hyundai building bridge lift up

Hyundai building sensor installation

Bibliography:

 N/A

 

 

 

 

 

©  SMARTEC SA 2009 - CREDITS