|
||||||||||||||||||||
Tunnels: Metropolitan Subway DongDaeMunCase study: SOFO SystemSubway tunnel
Project DescriptionSummary: DongDaeMun section on the subway (two single track in two tunnels). Curvature measurement and convergence analysis with long term monitoring and automatic operation Clients: Metropolitan Subway Seoul Place: Seoul (Korea) Period: 2000 - N/A Installation: Infra Structural Safety Research Center Structure's short description: Subway Tunnel Aim of monitoring: Monitor teh roof defrmations and strains Number of sensor: 10 Main Results: Not Discloses
side wall detail Bibliography: N/A
|
|
|||||||||||||||||||
|
|
||||||||||||||||||||
|
© SMARTEC SA 2009 - CREDITS |
||||||||||||||||||||