Tunnels: Mittelholz Tunnel Monitoring

Case study: SOFO, ADAM System

Stress Monitoring
Concrete vault

Project Description

Summary: Monitoring of compression strains in the vault of Mittelholz Tunnel.

Clients: Berner Fachhochschule, Switzerland

Place: Frutigen (Switzerland)

Period: 2002  - 2002

Installation: Smartec / Berner Fachhochschule

Structure's short description: During the construction of L?schberg gallery, a branch of Alptransit Swiss confederation project, the construction of a cut-and-cover tunnel to protect the main street from avalanches has been monitored.

Aim of monitoring: The aims were to better understand the tunnel vault behaviour during the recovering to be compared to theoretical hypotheses.

Number of sensor: 2

Main Results: The tests have shown the compression strains increasing during each recovering steps.

Bibliography:

 N/A

 

 

 

 

 

©  SMARTEC SA 2009 - CREDITS