Tunnels: Nunobiki tunnel crack monitoring

Case study: SOFO System

Tunnel monitoring
Crack opening Measurements

Project Description

Summary: Long-term crack opening monitoring

Clients: N/A

Place: Kobe (Japan)

Period: 2000  - N/A

Installation:

Structure's short description: Concrete-lining Tunnel

Aim of monitoring: Monitor crack opening evolution

Number of sensor: 2

Main Results: Not Disclosed

Bibliography:

 N/A

 

 

 

 

 

©  SMARTEC SA 2009 - CREDITS