Tunnels: Onnens Motorway A5Case study: SOFO, ADAM SystemCut and cover tunnel
Project DescriptionSummary: The cut and cover tunnel monitoring during concrete setting, geotecnical loads ans long-term Clients: Vaud Canton Place: Vaud Canton (Switzerland) Period: 2000 - 2003 Installation: De Cerenville G?technique,Smartec Structure's short description: The cross-section of the tunnel consists of two concrete vaults. The length of the tunnel is 1230 m. Aim of monitoring: The aim of the monitoring was to increase knowledge on the vaults behaviour during the outer filling loads application. 30 sensors were installed on one characteristic section. Fiber optic sensors are integrated in the global concept together with inclinometers, thermometers, load cells, piezometer cells and geometric measurement. Number of sensor: 6 Main Results: Behaviour and stabilization of the cut and cover tunnel has been verified at each phases of the filling.
Final connection box after the removal of the framework on a technical gallery
Connection box integrated in the framework
Fiber optic sensor and inclinometer in the central section Bibliography: N/A
|
|
|||||||||||||||||||
|
|
||||||||||||||||||||
|
© SMARTEC SA 2009 - CREDITS |
||||||||||||||||||||