Buildings: Watch production centerCase study: SOFO SystemLarge excavation
Project DescriptionSummary: Load monitoring on the mat foundation and slurry walls during construction works Clients: Watch production centre Place: Geneva Canton (Switzerland) Period: 2001 - N/A Installation: De Cerenvill G?thechnique, Smartec Structure's short description: The excavation concerns a 145 x 165 m soil surface with a maximum excavation level of about ? 20 m in very soft and saturated clays. The designed retaining system is composed of a slurry wall braced at its top. The bracing leans on a 130 m diameter circular reinforced concrete beam supported by piles that are linked with a buried circular internal slurry wall located at the excavation?s bottom. Aim of monitoring: The aims of the monitoring were to monitor the load on the circular internal slurry wall; sensors were placed tangentially on the rebar cage before the concrete pouring. Mat foundation was also monitored to control the thrusts of the external slurry wall. Number of sensor: 50 Main Results: Circular internal slurry wall sensors show the strain was up to 3,5 N/mm2. Engineers saw the real evolution of the load during the excavation, monitoring the load transfers.
Mat foundation monitoring
Measurement of the rebar cage
Rebar cage of the internal slurry wall with 6 fiber optic sensors Bibliography: N/A
|
|
|||||||||||||||||||
|
|
||||||||||||||||||||
|
© SMARTEC SA 2009 - CREDITS |
||||||||||||||||||||